Quiz
Software Engineering II
Marks: 15
Instructions
- Highlight the correct option against each MCQs
- Each question carries one mark.
- The deadline for Quiz submission is July, 23rd 2008.
- Quiz submitted after due date will not be graded.
1. Incomplete requirements gathering can result in the ___________ of the project
a) failure
b) reusability
c) success
d) easy maintenance
2. The root causes of project failure are
a) lack of user input
b) incomplete requirement and specification
c) creeping requirement
d) all of the given options
3. The template for organizing SRS given by American Department of Defense and NASA should be used for
a) large and complex projects
b) small project
c) medium size projects
d) none of the given
4. Traceability of requirements is helpful in the following except
a) preparing test cases
b) finding uses cases for a particular requirement
c) managing the schedule and budget of the project
d) identifying GUIs for a particular requirement
5. The Change Control Authority does not have the rights to permit the change in the software
a) True
b) False
6. Object un-lock is done by
a) check in
b) check out
c) both
d) none of these
7. In version control process if we opt X.Y.Z as a standard where X signifies major upgrade, Y signifies minor upgrades and Z signifies updates (bug fixing). Here _____________ variable(s) can be changed at a time.
a) 1
b) 2
c) 3
d) 4
8. Every node signifies ___________ version of a release
a) one
b) two
c) three
d) four
9. Incomplete Configuration identification documents may result in:
A. Defective Product
B. Higher Maintenance Costs
C. Schedule Product
D. Meet Software Quality
E. A,B,C
F. B,C,D
10. When an Item is base lined, it becomes frozen, here frozen means, that the item can be changed only by creating an old version
11. We can include following item(s) during configuration item identification:
A. User Manuals and Documentations
B. Source Code
C. Software Requirement Specifications
D. All of the above
12. Poka Yoke is the name of a
a) Japanese dish
b) QA technique
c) Idiom
d) None of the given
13. Configuration Management can be used while the project is in the ____________ phase
a) Testing
b) Development
c) Maintenance
d) All of the given
14. Poka Yoke is Japanese term and it means
a) Mistake Proofing
b) Mistake Handling
c) Mistake identification
d) Mistake assurance
15. ______________ gives the Mean time for which system remained available for use.